


category: Civil
Retaining wall. Sella River.
Emergency case on the Sella River. Cangas de Onis. Asturias. Spain.
Task
Remote embankment measurement. Beach of river deposits.
-
Date
September 4, 2019
-
Skills
Robotic Total Station Trimble S7 1¨. GNSS Trimble R8. Trimble Access. Bentley Power Civil. Bentley MicroStation.
-
Client
Obras Generales del Norte S.A.
-
Project link